You are not asking out of curiosity. You need to know how many days to plan around. Can you stay in your home? Do you need to take time off work? Search this question and the answers fight each other. One page says two days. Another says two weeks.
Both can be right. They are measuring different parts of the same job. Here is how long slab tunneling takes, broken into the phases that actually eat the days. Houston soil plays a part as well. Our clay is dense and heavy to move, and wet clay after a storm is heavier still.
Below you will find the four phases and what each one costs you in time. We cover what speeds a job up and what slows it down. You will also see whether you can stay home, and what your yard looks like when we leave.
Most slab tunneling jobs take two to five days from the first shovel to a filled tunnel. The work runs in four phases:
Longer runs push past that range. A reroute under the full length of a house can take two weeks or more.
Here is where the days actually go.
| Phase | What happens | Typical time |
|---|---|---|
| Dig | Crew hand-digs the tunnel to reach the break | 1–3 days |
| Repair | Plumber works on the pipe from inside the tunnel | Under a day to several days |
| Inspect | Pressure test confirms the fix holds | Same day |
| Backfill | Soil goes back in and gets packed down | Half a day to a day |
Digging starts outside, along the perimeter of your home. The first section is the slowest part of the whole dig. The crew goes straight down to get under the support beam, then back up the other side to reach the underside of your slab. That slab becomes the ceiling of the tunnel, which is what keeps the walls from caving in. Digs this deep fall under federal excavation and trenching safety rules. Most crews move somewhere between five and eight feet a day once past that first stretch.
Repair depends entirely on scope. One clean break in a single line can be done in a few hours. Replacing a long run of failing cast iron is a different job with a different number attached.
Inspection happens before the tunnel closes. We pressure-test the repair to confirm it holds. Some jurisdictions also require a permit and an inspection before backfill, so we check that at the start.
Backfill is the last step and it is not just shoveling dirt back in. The soil goes in and gets packed down in stages, which is what supports the slab above it.
Those four phases assume we already know where the break is. Often we do not yet.
We locate the failure first. You cannot dig toward a leak nobody has pinpointed. That is a separate step with its own appointment, and it usually happens well before a shovel touches your yard.
The location of that break sets everything that follows. Tunnel length is measured from the outside wall to the pipe. A break six feet in is a short dig. A break twenty feet in, under a kitchen island or the middle of a master bath, means a much longer tunnel and more days on the calendar.
That is why we will not quote you a timeline before we find the leak. Any number given without that information is a guess.
The averages hold for a typical job. Here is what pushes yours off the average.
That last one is not our preference. Federal safety rules bar crews from working in an excavation where water has collected, or is collecting, unless specific precautions are in place first. You can read the rule at OSHA's excavation standard. After a storm, the tunnel gets checked before anyone goes back in.
We scope the tunnel length after detection, not before. Once we know how far in the break sits and how deep the beam runs, we can give you a real number of days. You get that before work starts, not after.
Some jobs do not stay small. Age is usually the reason.
Plenty of older Houston homes still have their original cast iron drain lines. Cast iron corrodes from the inside out over decades. When a line reaches that stage, one break is rarely the only weak spot.
We tell you upfront when we think a spot repair is a short-term answer. You can still choose it, and sometimes that is the right call. But you should make that choice knowing what the pipe looks like, not after the second tunnel.
Yes, in most cases you can stay home. The work happens outside your house, not inside it.
Your floors stay untouched. No tile comes up, no carpet gets pulled, and no concrete gets cut inside your living space. That is the main reason people choose tunneling over breaking through the slab from above.
You will notice two things in your yard:
Water and drain service will go off for stretches while the repair is live. We tell you when and roughly how long each time. Where the layout allows, we sequence the work so you keep at least one bathroom running.
Compare that to breaking through the floor. That means a jackhammer inside the room you use most, dust through the house, and an open hole in your kitchen or bathroom until the job is done. Days matter less when you can sleep in your own bed.
Backfill is the last phase and it deserves more attention than it usually gets.
The soil goes back in stages and gets packed down as it fills. Loose dirt shoveled back in leaves voids under your slab. Packed soil supports it. That step is what protects your foundation from settling later, and it is worth the extra hours it takes.
We restore the grade as close to the original as the soil allows. Some surface settling over the following months is normal, especially through our wet and dry swings. A shallow dip you can fill with topsoil is expected. A deep or fast-growing depression is not, and you should call us if you see one.
A break under your foundation is not a wait-and-see problem. The sooner we locate it, the shorter the tunnel and the fewer days you lose.
We serve Houston and the surrounding communities, including The Woodlands, Conroe, Humble, Spring, Kingwood, Tomball, Magnolia, Atascocita, Jersey Village, and Klein. Check our service areas to confirm we reach your neighborhood.
Abacus Plumbing, Air Conditioning, & Electrical has served Houston homeowners since 2003. We answer around the clock, every day of the year, including holidays. Slab problems rarely announce themselves at a convenient hour.
Want a real timeline for your home? Browse our full range of Houston plumbing services or schedule your visit online.
Business Address: 4001 Kendrick Plaza Dr, Houston, TX 77032
Call (713) 812-7070 to book your visit.
Most jobs run two to five days from the first shovel to a filled tunnel. That covers digging, the repair itself, a pressure test, and backfill. Longer runs push past that range, and a reroute under the full length of a house can take two weeks or more.
Yes, in most cases. The tunneling happens outside your house, so no floors get cut and no concrete comes up inside your living space. Water and drain service will go off for stretches while the repair is live, and we tell you when and roughly how long each time.
Because tunnel length depends on where the break sits, and that has to be located first. A break six feet in is a short dig. A break twenty feet in, under the middle of the house, is a much longer one. Any number given before detection is a guess.
Work stops until the tunnel is checked. Federal safety rules bar crews from working in an excavation where water has collected unless specific precautions are in place first. Houston clay also gets heavier and slower to move once it is saturated.
It depends on the job, but tunneling keeps the work outside your home. Breaking through means a jackhammer inside the room you use most, dust through the house, and an open hole until the repair is done. Your floors stay untouched with a tunnel.